Excavation permit processing manual
The main purpose of Excavation Permit Processing Manual (the Manual) is to provide guidance on the procedures for the application and administration of excavation permits. Application of excavation permit (XP) may involve various government departments and corporations. To facilitate the application of XPs. Section 1 – Risk Assessment Document the hazards and analyse the risks associated with the excavation or digging activities to be undertaken. Location of excavation: BAC Area / Location: Likely depth of excavation works: (mm to M (1 M to M in known sandy or unstable locations ( M Reason for excavating: Work activity description: Nature of work to be . For details please see Excavation Permit Processing Manual Appendix ; and Submit the detailed the excavation plan to the parties listed in Table 1 and 2 in Appendix in the Conditions of Excavation Permit, to request for indication of their existing installations in the vicinity, and invite them to conduct works during the same period.
The manual covers advance planning of construction projects, all construction-related NYC DOT permits, and how and when to obtain these permits Visit the Street Works Manual. NYC DOT issues over different types of sidewalk and roadway construction permits to utilities, contractors, government agencies and homeowners. • Processing Permits • Inspection, Enforcement and Warranty • Encroachment Permit Billing and Accounting It is the Division's intent to ensure that encroachment permits are issued promptly, the work is completed in accordance with all applicable regulations and City Standards, and all requirements of the construction warranty are met. reference should be made to PNAP ADV and HyD's Excavation Permit Processing Manual - Chapter 5, Section 1 which may be accessed / downloaded at HyD's website an Excavation Permit from the Director of Highways is required for the necessary work. The temporary access should be formed and reinstated to its original state on.
Chinese Version. G.N. Land (Miscellaneous Provisions) Ordinance (Chapter 28) - (Notice under section 18C (1) (a) for specification of time limit for submission of an application for the issue of an excavation permit and the extension of the period for which an excavation permit is valid) Chinese Version. The following are the administrative procedures for on-line applications. BOE Staff will also confirm the on-Line “queue” is checked at least twice a day (recommend am and pm) and that all A-Permit applications submitted on-line should be processed within one business day of receipt. The main purpose of Excavation Permit Processing Manual (the Manual) is to provide guidance on the procedures for the application and administration of excavation permits. Application of excavation permit (XP) may involve various government departments and corporations. To facilitate the application of XPs.
0コメント